The mill is designed to crush continuously for up to 6 minutes or 10 kg (22 lb) worth of grain.
If milling larger quantities, allow the mill to rest for at least 3 minutes after each 6 minutes of use or every 10 kg (22 lb) of grain milled.
If milling larger quantities, allow the mill to rest for at least 3 minutes after each 6 minutes of use or every 10 kg (22 lb) of grain milled.